Subsequent EIR - Draft

Subsequent EIR-DRAFT
TABLE OF CONTENTS Download
1.0 EXECUTIVE SUMMARY Download
2.0 INTRODUCTION Download
3.0 PROJECT DESCRIPTION Download
4.0 EXISTING SETTING, IMPACTS, AND MITIGATION MEASURES
  1. LAND USE AND PLANNING
  2. GEOLOGY AND SOILS
  3. HYDROLOGY AND WATER QUALITY
  4. TRANSPORTATION AND CIRCULATION
  5. AIRQUALITY
  6. NOISE
  7. BIOLOGICAL RESOURCES
  8. AESTHETICS
  9. RECREATION
  10. HARZARDS AND HAZARDOUS MATERIALS
  11. GREENHOUSE GASES
Download
5.0 ALTERNATIVES Download
6.0 LONG-TERM IMPLICATIONS OF THE PROJECT Download
7.0 MITIGATION MONITORING AND REPORTING PORGRAM Download
8.0 CERTIFIED FINAL PROGRAM EIR NO. 591 MITIGATION Download
9.0 REPORT PREPARERS Download
10.0 REFERENCES Download

APPENDICES

APPENDICES COVER Download
A: NOTICE OF PREPARTION (NOP) & NOP COMMENTS Download
RE-ISSUED NOTICE OF PREPARTION Download
PROGRAM EIR EXECUTIVE SUMMARY Download
B: GEOLOGICAL ENGINEERING REPORT Download
C: DANA POINT HARBOR BOAT TRAFFIC STUDY Download
D: AIR QUALITY ANALYSIS Download
E: NOISE IMPACT ANALYSIS Download
F: MARINE BIOLOGICAL RESOURCES REPORT Download
FOCUSED SURVEY REPORT FOR EELGRASS AND INVASIVE ALGAE Download
MARINE BIOLOGICAL FIELD SURVEY RESULTS Download
NESTING BIRD REPORT Download